Enhanced MPLS Next Generation Transport (EMNGT)
Network for induction of Super Core in IPMPLS network of BSNL With
Comprehensive AMC
About Super Core Project:
The proposed Super Core Expansion in BSNL IP-MPLS network is envisaged with a bigger vision of data transport on 100G to meet complete demand of Enterprise, CFA and CM verticals for upcoming years. With this Super Core Expansion project, Point of Presence which is essence of Enterprise Business to convince the customers at the time of acquisition will be increased. Super Core High Density Network will give edge to
BSNL in best-in-class services to all enterprise customers and guaranteed internet speed to all Broadband and ILL customers in BSNL as per the prevailing policies of BSNL.
Benefit of Deploying Super Core Routers:
- Increase in the Bandwidth handling of BSNL Core network, data transport of 100G.
- Deployment SDN (Software Defined Network) in BSNL that helps to promote services like Band width on demand, congestion-based routing, Traffic Engineering and improved QoS to the esteemed customers of BSNL in view upcoming super edge in network.
- Benefit due to Increase in number of ports 10G/100G and required STM-16/10G/100G ports for enterprise costumers in view of upcoming years.
- New High Capacity IGW routers are planned to benefit the Internet requirements of all customers covering mobile and Broad Band in BSNL for next three years with a provision for expansion.
- Redeployment of existing routers as edge routers post migrations, to expand the network of BSNL.
Super Core Project Deployment:
Supreme Solution Pvt Ltd, a leading provider of cutting-edge telecom and IT solutions and services was chosen for deploying SCR Equipment.
SSPL Scope Under Super Core deployment:
- Physical Installation: Supreme have successfully supplied, installed, testing and commissioning of EMNGT Super Core network equipment on trunky basis.
- Commissioning: Our expert team carried out comprehensive commissioning procedures for all installed sites, guaranteeing optimal performance and functionality, with in the agreed scope.
- Acceptance Testing: we conducted thorough acceptance testing for each site, ensuring alignment with Customer specific needs and expectations.
- Equipment Migration: Our skilled Engineers seamlessly migrated from old equipment to the new supplied equipment across all sites, minimizing disruptions and maximizing efficiency.
- Validation Testing: Rigorous validation testing was conducted on the supplied equipment to ensure its reliability and adherence to industry standards.
- End-to-End EMS Deployment: Our team successfully deployed an advanced Element Monitoring System (EMS), providing you with real-time monitoring capabilities for enhanced operational control of entire Super Core Network.
- 24/7 O&M Support: To ensure uninterrupted operations post-implementation, we have deployed a dedicated team of 10 O&M resources who are providing round-the-clock support for any maintenance or operational issues that may arise.
- Preventive Maintenance: To ensure uninterrupted operations, the procedure been defined go carry out preventive maintenance on all nodes on quarterly basis across India, keeping customer network in top-notch condition at all times, as part of AMC.
- AMC for 5 Years: we have signed annual maintenance contract (AMC) for a period of 5 years. This covers all necessary repairs or replacements during this duration, giving peace of mind and minimizing downtime for the customer.
Current Status of Project:
Supreme have successfully provided O&M during the warranty period of project and along with duration of agreed O&M period of 18 months post I&C of the Super Core Project.
Currently Supreme is carrying out comprehensive AMC for the duration of 5 years, since the project I&C been completed.